Hyster Nacco – Logistics Centre Hub

Craigavon, Co Armagh

In 2012 PMcK won the electrical design and Build contract a purpose built facility for the Nacco Materials Hub in Hyster, Craigavon where the Hyster and Yale Brands of Forklifts are built.
The facility encompasses 40,000 Sqft of Internal Warehouse distribution and over 20,000 sqft of External storage, Carparking and Testing Bays.

  • LV Power Distribution
  • Office & Warehouse Lighting,
  • Fire Alarm Installation ,
  • Emergency Lighting,
  • Fibre Backbone and Data Cabling

Client NACCO

Details Electrical design and Build contract

Main Contrator MDK Construction

Electrical Contractor In House Design and Build

Duration 4 Months