Holiday Inn – Manchester Piccadilly

Manchester

PMcK delivered the complete electrical installation for this Landmark Building over 15 Floors.

298 Bedrooms, 12 Meeting Rooms, Restaurant, Public Bar and Conference Suite with substantial Back of House areas,

A Bespoke LED Façade system, designed and installed by PMcK is a key feature of the building

The hotel occupies a prime position as part of the highly successful and recently completed 250,000sqft mixed use Piccadilly Regeneration Project which has now become a vibrant gateway to the City Centre, highly regarded as the UK’s second city, both in commercial terms and tourism attractions.

PMcK were the main Electrical Contractor, responsible for the

  • LV Intake & Mains Distribution
  • Containment Systems
  • Sub Mains Cabling
  • Rising Bus Duct System
  • Life Safety Systems
  • Fire Alarm System
  • Fire Fighting Supplies
  • Lighting & Emergency Lighting
  • Critical Power Systems
  • Back Up Power & Generators
  • Small Power & Lighting
  • Decorative and Bespoke Interior Lighting
  • Bespoke External Facade LED Showcase System

Client Dominivs Group

Details 298 Bedroom Holiday Inn

Main Contrator Mc Aleer & Rushe Contracts

M&E Consultant Caldwell Consulting